Factories
Factories and Industrial equipments
Choman Company is the owner of the following factories:
Block Factory
• This Factory founded since 1983.
• Production capacity is 800 block per hour
• The block made as Iraqi standard specification.
• The factory is capable for producing different type and size of block such as
(20x20, 20x10, 30x30) and Biharton bricks.
Filler Factory
• Filler is a material produced from stone used as a construction material in
roads with asphalt and used as a mixture with white concrete for tile
installation.
• The Production capacity is 100 ton per hour.
Industrial Equipments
Choman Company has several industrial equipments that are used in the factories.
|
Works Done
Contract
Construction of 12 classroom school in Chamchamal/Kirkuk district. Cost of the project (245,000 US$). Starting date: 28 August 2001 and completion date: 11 July 2002
supply
Construction of 12 classroom school in Chamchamal/Kirkuk district. Cost of the project (245,000 US$). Starting date: 28 August 2001 and completion date: 11 July 2002
road
Construction of 12 classroom school in Chamchamal/Kirkuk district. Cost of the project (245,000 US$). Starting date: 28 August 2001 and completion date: 11 July 2002
construction
Construction of 12 classroom school in Chamchamal/Kirkuk district. Cost of the project (245,000 US$). Starting date: 28 August 2001 and completion date: 11 July 2002
Read more works
|